This comprises of a 10km stretch with 2 viaducts, 9 overbridges, 3 underbridges, 4.9M m3 of excavation and 4.4M m3 of fill.
Clearing blocked drains, blocked toilets, sinks, pipes, CCTV surveys, maintenance work, drain excavations and repairs, repairing manholes and any other duties…
We’re seeking to recruit a Section Engineer with Highways and Structure experience for a Major Infrastructure project.
EKFB is proud to have been appointed by HS2 to deliver civil engineering works across an 80km section of the new high speed rail link between the Chiltern…