Measure and cut plasterboard to the right sizes and angles. Fix the plasterboard panels to timber or metal frames (walls and ceilings).
Installing various types of plasterboard to various substructures. Using tape and joint method to fill and joint plasterboard ready for painting.
This position is to work on new builds both inside and out such as skimming plasterboard and rendering blockwork. Job Types: Full-time, Contract.
Install drylining and plasterboard linings eg panels, plasterboards, metal sections, timber battens, wallboards, thermal boards, glass reinforced gypsum board,…