HNC In Electronics with approved apprenticeship and 3 some working experience minimum, Degree qualified in relevant discipline with experience preferred.
Management and maintenance of the existing reporting architecture across PowerBI, SSRS and Daily reporting requirements. Full training will be provided.
After painting, using fine paper to remove blemishes and dirt in the paint. Hours: * Full time, permanent, 554 shift pattern.
Preparing vehicles with masking paper to protect areas not required for painting. After painting, using fine paper to remove blemishes and dirt in the paint.
Painting small areas using SMART painting equipment. Hours: Full Time 40.25 Hours per week ( WE HAVE TWO SHIFT PATTERNS AVALIABLE).
Day shift: *Days: 6:30am - 18:30pm on a 554 shift pattern. Shift pattern - 5 days on, 5 days off, 4 days on, 5 days off, 5 days on, 4 days off.*.
Work collaboratively with Scheduling, Customer and representatives to build and deliver effective work programmes to achieve SLA. MAM Unit Compliance + Usage.
Lead Control System Verification & Validation Engineer, will be responsible for the delivery of the of HVDC Controls & Protection Verification and Validation…
Hours: Part-Time / Full-Time Hours Available. Hourly Rate: £10.05 above 18 | £7.00 aged 17 | £6.50 aged 16.
Your role as BIM Technician will see you commence work on a variety of water projects for major clients and you will be based on either one large project or a…